The Building of Town Refuse at Leeds

- From selected papers of the Institution of Civil Engineers, London, by Charles Slagg, Assoc. Memb. Inst. C.E.

There are two floors: one on the ground level, a few feet only above the outlet for drainage, the other floor, or raised platform, being 15 feet above it. The refuse is taken in carts up an incline of 1 in 14 on cast-iron tram plates to the upper floor, and deposited upon and alongside of the destructor, and is shoveled into a row of hoppers at the head of the cells. These hoppers are in the middle of the width of the destructor, and each communicates with a cell on each side of it. The refuse is always damp, and often wet, and after being put into the cells is gradually dried by the heat reflected upon it from the firebrick arch of the cell, before it descends to the furnace. This distinguishes the system from the common furnace, and enables the wet material to be burned without other fuel. No fresh fuel is used after the fires are once lighted.

License information: nan
MPAA: G
Go to source: http://www.gutenberg.org/files/8687/8687-h/8687-h.htm#6

Text difficulty